1. Join E-Subscriptions
  2. Submit a Service Request
  3. Pay Your City Utility Bill
  4. Sign Up for a Class
  5. eTrakit/Online Permitting
  6. Employment Opportunities
  7. Buy Grand Theatre Tickets
  8. Watch Live Council Meetings
  9. Submit an Online Police Report
  10. Tracy Municipal Code
  11. Master Fee Schedule
A A A

Public Notice

10 10 19 Public Outreach Meeting

Posted: Sep 27, 2019

CITY OF TRACY

DEVELOPMENT SERVICES DEPARTMENT

PUBLIC OUTREACH MEETING

 

The City of Tracy City Engineer will hold a Public Outreach meeting on October 10, 2019 at 6:00 p.m., or as soon thereafter as possible, in the City Hall, Conference Room 203, 333 Civic Center Plaza, Tracy, California, 95376, to consider the following:

 

City of Tracy is initiating the process for adoption of the Precise Plan Alignment for the Chrisman Road Extension.  The Precise Plan Alignment will determine the alignment and configuration of the new street, right-of-way width, locations of street intersections and access to fronting properties.  The preliminary Precise Plan Lines for both the interim and ultimate conditions have been prepared on behalf of the City and are included with this letter for your information.  The City intends to adopt the Precise Plan Alignment as follows:

  • Chrisman Road – Interim Plan, a four lane divided expressway extending from Grant Line Road northerly and easterly for approximately 3,800 feet to the point of conform with existing Pescadero Avenue.  The most easterly approximately 600 feet of the new roadway will consist of temporary improvements necessary to conform to the existing Pescadero Avenue improvements.  A portion of existing Pescadero Avenue also will be realigned and widened to intersect with the new Chrisman Road alignment.
  • Chrisman Road – Ultimate Plan, a four and six lane divided expressway extending easterly from the terminus of the Interim Plan improvements for approximately 1,500 feet to the future I-205/Paradise Road freeway interchange.  The temporary improvements and conform to existing Pescadero Avenue constructed under the Interim Plan will be removed.  A portion of existing Paradise Road will also be realigned and widened to intersect with the new Chrisman Road alignment.

The Chrisman Road Extension is included in the City of Tracy Transportation Master Plan, and was analyzed in the Transportation Master Plan and Northeast Industrial Specific Plan Environmental Impact Reports.

This letter is being forwarded to you to seek your input on the proposed alignment.  The City will identify the requirements for dedication of rights-of-way and construction of frontage improvements in accordance with City Regulations when the fronting properties submit development applications to the City.

City intends to conduct an informational meeting to provide information and receive comments on the attached Precise Plan Alignment from interested property owners on October 10, 2019 at 6:00 p.m. in Conference Room 203, located at 333 Civic Center Plaza, Tracy CA.  You are invited to review the proposed Precise Plans and to provide comments orally or in writing before or during the meeting.

The Precise Plan Lines will be considered for adoption by the City Council at a future City Council meeting at a Public Hearing with appropriate notifications to the affected property owners and interested parties.


 

ROBERT ARMIJO, PE

CITY ENGINEER


Sitemap   |   Privacy Policy   |   Site Policy   |   Employee Login   |  
Bookmark and Share               
Website Design and Development by Jel