Corral Hollow Road Widening and Sewer Upgrade

CIP #:73102 & 74118

Project Description

This project includes widening of Corral Hollow Road from four lanes to six lanes and an upgrade of the existing sanitary sewer facilities between Byron Road and Grant Line Road.  One additional lane in each direction will be added by reducing the median island width from 40 feet to 18 feet.  Completion of this project will improve traffic circulation and provide addition capacity for the sewer system to better serve the community needs.

In addition, the project includes intersection modifications at Foothill Ranch Drive and Corral Hollow Road limiting the eastbound left turning movement from Foothill Ranch Drive to go to northbound Corral Hollow Road. These improvements will enhance traffic safety at this intersection. Traffic signals and landscaping will also be modified to accommodate the road widening.

Project Location

Timeline

To minimize the traffic delays and inconvenience to parents and children attending various schools in the project vicinity, the major components of the project will be constructed during the 2017 school summer break. However some of the project activities will continue after the summer break.  The following is an initial tentative construction schedule.

  • Advertise for Bidding                    February 2017
  • Construction Begins                     May 2017
  • Widening Complete                      August 2017
  • Sewer Line Complete                   November 2017
  • Project Completion                       March 2018


Project Renderings / Maps

Project Rendering


Project Updates

Project advertised for bidding February 17, 2017 (Bids due March 20, 2017)

Press Release 02/15/2017

Frequently Asked Questions (FAQs)

Alternate Route to West High and Art Freiler

Alternate Routes to West Valley Mall

Project Fact Sheet

<Subscribe to City of Tracy News: RSS>


Budget

To be announced once bids are opened.


Contractor / Consultant

Design Consultant:  CH2M of Oakland, CA

Contractor:  To Be Announced.


Contact

Paul Verma, Senior Civil Engineer
City of Tracy
(209) 831-6460
paul.verma@ci.tracy.ca.us